Special Insulation Considerations

 

 Location

 Application

Min. R-Value

Coverage

 Slab on Grade Alternate #1

*(Ti-To) 0.125

Perimeter to below frost line
  Alternate #2

R-5

4' horizontal or vertical at perimeter
  Alternate #3

R-5

under entire slab and slab edge
Slab Below Grade  

** R-5

 
Suspended Floor      
 Over Heated Space Hard Surface

R-5

under entire floor with 2" air gap
  Carpeted Surface

R-11

under entire floor with 2" air gap
 Over Unheated Space Hard Surface

R-13

under entire floor with 2" air gap
  Carpeted Surface

R-19

under entire floor with 2" air gap
Walls with Panels Outside Wall

R-13

entire wall
  Inside Wall

optional

 
Ceiling Panels Inside Ceiling

R-11

entire ceiling above panel
  Outside Ceiling

R-30

entire ceiling above panel

*R-value = Inside Temperature - Outdoor Temperature x 0.125 (temperatures in °F)
** For slab above frost line

 

Pressure Testing Embedded Tubing -

100 PSI for at least 30 minutes
Pressure reduced to 30 PSI before cement is poured.
Refer to Section 12.1 and section 21.1.

Floor Surface Temperatures -

85°F (29°C) max. in prolonged foot contact areas
90°F (32°C) max. other than prolonged foot contact areas
85°F (29°C) max. on solid or laminated hardwood flooring

Fluid Temperatures -

140° (60°C) max. in gypsum or concrete based thermal mass unless approved by manufacturer design and installation instruc tions.
160° (71.1°C) max. underside of wood subfloor
180° (82.2°C) max. underside of wood subfloor when approved by tubing manufacturer's design methods

Floor Covering - R-value not to exceed design requirement

Tube Placement -

Structural Slab
2" min. below surface, no tube joints in slab, sleeved a min. of 4" either side of expansion joint.
Any repairs to tube damaged during pour shall be made with factory approved fitting and should be wrapped.
 
Non-structural
3/4" underlayment over highest point in tube
1/8" min. gap between butt ends of aluminum plates no inaccessible tube joints
 
Joist Space
1/8" min. gap between butt ends of aluminum plates
2" air gap below tube except where aluminum plates are used

Tube Length -

 Tube Size

 Recommended

 Maximum

 1/4" I.D. tubing

100 ft.

125 ft.

 3/8" I.D. tubing

200 ft.

250 ft.

 1/2" I.D. tubing

300 ft.

350 ft.

 5/8" I.D. tubing

400 ft.

500 ft

 3/4" I.D. tubing

500 ft.

600 ft.

 1" I.D. tubing

750 ft.

750 ft.

     
 NOTE: This chart is for indoor radiant heating - not snow melting applications.

 

Oxygen Permeation - Options:

Oxygen barrier tube, less than 0.1 gram/m3/day at 40°
Heat Exchanger to isolate non-oxygen barrier tube
Water treatment to inhibit corrosion due to oxygen